Frame Construction
sports complex in Dubai. The track system was specifically selected to withstand extreme temperatures and prolonged UV exposure common in the UAE climate, ensuring long-term durability and user safety.
A dual-layer jogging track system was implemented to provide optimal shock absorption, surface stability, and comfort for runners of all levels. The total installed area covered approximately 4,500 sqm, delivered within a tight project timeline while meeting international quality standards.
The project was completed in compliance with certified sports surface specifications and tested to ensure performance, safety, and resistance to weather conditions.